SMI PE Labellers, BEMA filling line


















If you decide to buy equipment at a low price, make sure that you communicate with the real seller. Find out as much information about the owner of the equipment as possible. One way of cheating is to represent yourself as a real company. In case of suspicion, inform us about this for additional control, through the feedback form.
Before you decide to make a purchase, carefully review several sales offers to understand the average cost of your chosen equipment. If the price of the offer you like is much lower than similar offers, think about it. A significant price difference may indicate hidden defects or an attempt by the seller to commit fraudulent acts.
Do not buy products which price is too different from the average price for similar equipment.
Do not give consent to dubious pledges and prepaid goods. In case of doubt, do not be afraid to clarify details, ask for additional photographs and documents for equipment, check the authenticity of documents, ask questions.
The most common type of fraud. Unfair sellers may request a certain amount of advance payment to “book” your right to purchase equipment. Thus, fraudsters can collect a large amount and disappear, no longer get in touch.
- Transfer of prepayment to the card
- Do not make an advance payment without paperwork confirming the process of transferring money, if during the communication the seller is in doubt.
- Transfer to the “Trustee” account
- Such a request should be alarming, most likely you are communicating with a fraudster.
- Transfer to a company account with a similar name
- Be careful, fraudsters may disguise themselves as well-known companies, making minor changes to the name. Do not transfer funds if the company name is in doubt.
- Substitution of own details in the invoice of a real company
- Before making a transfer, make sure that the specified details are correct, and whether they relate to the specified company.
Seller's contacts




















Capacity: max. 6,000 bottles/h
Product: still mineral water
Container: 6.0 L PET bottle, single bottle with handle and EAN barcode
Preform: 100% rPET, 86.5 g
Closure: 48/41 cap
Pallet: Euro pallet
From October 2026; the line must be dismantled by the end of October 2026. Dismantling, packing and truck loading can be arranged on request. Location: France
Overview
Complete PET bottling line for still mineral water in 6.0 L PET bottles with handle
max. 6,000 bottles/h. The heart of the line is an SMI ECOBLOC ERGON blow moulder-filler-capper combiblock
followed by handle application
rotary labelling and robot palletizing. Built in 2022
started up in 2023 and run only 3 to 4 times a year
Technical data
Scope of Delivery
Blow moulder-filler-capper combiblock | SMI | ECOBLOC ERGON 6-20-5 HC EV | blow moulder for 6 moulds (moulds not included)
filler with 20 filling valves
capper with 5 capping heads
cap sorter and cap elevator | 2022
Discharge conveyor | SMI | bottle conveying from the combiblock | 2022
Accumulation table | SMI | FIFO | for filled bottles | 2022
Bottle divider | SMI | DV 500S ERGON | 1 lane in
2 lanes out | 2022
Drying tunnel | EUROPOOL | before the handle applicator | 2022
Handle applicator | TWINPACK | double lane
with barcode applicator | 2022
Drying tunnel | EUROPOOL | before the labelling machine | 2022
Bottle combiner | SMI | 2 lanes in
1 lane out | 2022
Conveyor | SMI | from the accumulation table to the labelling machine | 2022
Rotary labelling machine | P.E. LABELLERS | ROLLMATIC MODULAR TOP SL 960 10T | 2022
Conveyor | SMI | from the labelling machine to the palletizer | 2022
Palletizer | BEMA | 2 FANUC robots
interlayer device | 2022
Electrical panels | main distribution panels with all components for all machines and conveyors | 2022
Format parts and spare parts | all available format and spare parts
Not included
Pressco preform and neck inspection
Heuft fill-level and cap inspection
pallet wrapper
preform and cap feeding from the pallet tipper to the hoppers
high-pressure compressor for the blow moulder
low-pressure compressors
utilities
piping and wiring from the main distribution to the machine panels
civil works
Condition
As-new condition
low operating hours. Annual preventive maintenance by the OEMs plus regular in-house maintenance. In production until the end of April 2026 and still installed
dry run on request
inspection by appointment. Electrical and mechanical drawings
PLC programs with backups
service and maintenance manuals and spare parts books are included
Availability